WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Preparation of Main Plant for Manoeuvring from in Port Condition 4, Ensure that the information concerning the above being carried out is recorded along with the times at which each section is completed. notify the bridge Inform the bridge that the main engines are ready for use, Reset main turbine trips and confirm that the control oil and lubricating oil pressures are normal Using the controls in manual mode Repeat the ahead and astern movements to warm through the turbine to a superheat temperature approaching that of the boiler., Repeat the ahead and astern movements to warm through the turbine to a superheat temperature approaching that of the boiler. After the turbine has been warmed through 1. Turn in the manual mode 2. Place the controls in automatic mode, with the telegraph in stop position. 3. Allow engine to continue to warm through on the auto-spin program., Put main turbine controls to bridge control mode and monitor their response as manoeuvring proceeds. finally The Main Turbine is Now Ready to Put to Sea, 1. Turn in the manual mode 2. Place the controls in automatic mode, with the telegraph in stop position. 3. Allow engine to continue to warm through on the auto-spin program. As required by international rules Ensure that the information concerning the above being carried out is recorded along with the times at which each section is completed., Inform the bridge that the main engines are ready for use at standby mode Put main turbine controls to bridge control mode and monitor their response as manoeuvring proceeds.