Warning:
JavaScript is turned OFF. None of the links on this page will work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Contingencies, Voltage problems e.g., Deviation From Buss Voltage Limits, "Staying ahead of the load" e.g., It can take up to 2 hours for power to come to cost, Security Coordinator constantly monitors Transmission system, Deviation From Buss Voltage Limits requires Bringing other Units Online, Interface problems particular concern is Deviation From Buss Voltage Limits, Rapid Changes in Demand mandate Anticipation of peak load, Contingencies involve coping with Interface problems, Interface problems can lead to Amperage problems, "Staying ahead of the load" means Always being prepared for the next 1000MW, Rapid Changes in Demand e.g., Just at shift change in wintertime, Rapid Changes in Demand mandate Monitoring the Resources Needed at Peak, Interfaces are subject to Interface problems, Voltage problems e.g., Surge, Interface problems involve Florida, Anticipation of peak load requires Prepared List of Resources, Contingencies are handled by Security Coordinator, Contingencies involve coping with Losses, High Level of Mental Workload depends on Resources, Interface problems can lead to Voltage problems, Amperage problems e.g., Overload