WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Node_13b_Preparing TA for running, Open T/A Steam main line supply valve to steam control valve which is at 0%, T/A LO cooling inlet and outlet valves (Fresh Water side) After opening of Valves Select 'M' for Manual Operation (of the steam supply valve), T/A Preparation Open Steam to Condenser Valve, Gland Seal Ref Valve After opening of Valves Select 'M' for Manual Operation (of the steam supply valve), Select 'M' for Manual Operation (of the steam supply valve) Steam Supply Valve Position 0%, rises and the low pressure alarm is cleared at 750 psi Warming up & Running up to Speed, 0% After checking postion of valve Open both Bulkhead Stop Valves, Steam to Condenser Valve After opening of Valves Select 'M' for Manual Operation (of the steam supply valve), T/A Preparation Open T/A Winding cooler inlet and outlet valves (Fresh Water side), T/A Preparation Open T/A LO cooling inlet and outlet valves (Fresh Water side), T/A Winding cooler inlet and outlet valves (Fresh Water side) After opening of Valves Select 'M' for Manual Operation (of the steam supply valve), Open both Bulkhead Stop Valves after opening bulkhead stop valves Open T/A Steam main line supply valve, Open T/A Steam main line supply valve steam Supply Pressure before the steam contol valve rises and the low pressure alarm is cleared at 750 psi, T/A Preparation Open Gland Seal Ref Valve