WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Node_16a_ Precheck to Start the Main Turbine Lubrication System, Deaerator Full with guage glass reading Between 60~70 mm, Checks to be done Required Scenario Condenser, Pressure About 6 Mpa Running on HFO supply, Checks to be done Required Scenario Tanks, Simulator to Start the Main Turbine Lubrication System Checks to be done, Condenser Condenser Vacuum Satisfactory and Cooling on, Tanks Atmospheric Drain Tank (ADT) About 60% full, Boilers Boiler 2 Pressure, Electrical Power Diesel Generator On Load, Tanks Distilled Water Tank (DWT) About 60% full, Checks to be done Required Scenario Deaerator, Electrical Power Emergency Generator Auto, Stand-by, Electrical Power Turbo Generator 2 Off, Electrical Power Shore Power Off, Electrical Power Turbo Generator 1 On Load, Checks to be done Required Scenario Boilers, Boilers Boiler 1 Pressure, Checks to be done Required Scenario Electrical Power