WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Preparation of Main Plant for Manoeuvring from in Port Condition 1, To run up second turbine generator. place Second generator on the main switchboard in parallel with the generator in use., Second generator on the main switchboard in parallel with the generator in use. ensure Diesel Generator on standby and ready to run, should it be required., Start raising the main steam line pressure to the main turbine by slowly opening the bypass valve on both boiler main turbine stop valves. carrying out the following Precautions, Diesel Generator on standby and ready to run, should it be required. once loading arms confirmed are disconnected Start raising the main steam line pressure to the main turbine by slowly opening the bypass valve on both boiler main turbine stop valves., Preparation of Main Plant for Manoeuvring from In Port Condition you must conduct the prerequisite checks 1. Two Boilers in Operation. 2. Main Condenser Vacuum Raised. 3. Main Turbine Turning Gear in Operation. 4. Bypass valve on main turbine stop valves on both boilers adjusted to maintain a pressure of 200kpa on the main steam line., 1. Two Boilers in Operation. 2. Main Condenser Vacuum Raised. 3. Main Turbine Turning Gear in Operation. 4. Bypass valve on main turbine stop valves on both boilers adjusted to maintain a pressure of 200kpa on the main steam line. prepare To run up second turbine generator.