WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Warming 3, AUTOSPIN engages after 3 minutes at standby engines Transfer Main Turbine Control Mode from ECR to Wheelhouse., Engine Room Movement Book of Time, Transfer Main Turbine Control Mode from ECR to Wheelhouse. update Engine Room Movement Book, AUTOSPIN confirm AUTOSPIN engages after 3 minutes, AUTOSPIN confirm Turbine turns ahead and astern sequentially., Engine Room Movement Book of Event Name, Turbine turns ahead and astern sequentially. at standby engines Transfer Main Turbine Control Mode from ECR to Wheelhouse., Once Main turbine side is in good working order continue to Turn the main turbine ahead and astern., Change over the main engine control to the ECR LEVER CONTROL position Switch on AUTOSPIN, Engine Telegraph Test from Bridge. When permission is received from the bridge/terminal that the gangway is removed Change over the main engine control to the ECR LEVER CONTROL position, Time for • Loading arms all disconnected and permission granted to commence warming through the main turbine. • Main turbine stop valves open. • Turning gear stopped and disengaged. • Main turbine trip tested. • Main turbine warning through in ECR Direct Control. • Main turbine on ECR Lever Control and Autospin active. • Main Engine on Wheelhouse lever control., Turn the main turbine ahead and astern. conduct Engine Telegraph Test from Bridge., Event Name for • Loading arms all disconnected and permission granted to commence warming through the main turbine. • Main turbine stop valves open. • Turning gear stopped and disengaged. • Main turbine trip tested. • Main turbine warning through in ECR Direct Control. • Main turbine on ECR Lever Control and Autospin active. • Main Engine on Wheelhouse lever control.