WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Node_15a_Precheck to Start Condensate Extraction, Electrical Power Turbo Generator 1 On Load, Boilers Boiler 1 Pressure, Electrical Power Diesel Generator On Load, Boilers Boiler 2 Pressure, Checks to be done Required Scenario Tanks, Pressure About 6 Mpa Running on HFO supply, Deaerator Full with guage glass reading Between 60~70 mm, Checks to be done Required Scenario Power, Tanks Atmospheric Drain Tank (ADT) About 60% full, Electrical Power Turbo Generator 2 Off, To Start Condensate Extraction Checks to be done, Checks to be done Required Scenario Boilers, Electrical Power Shore Power Off, Checks to be done Required Scenario Deaerator, Tanks Distilled Water Tank (DWT) About 60% full, Electrical Power Emergency Generator Auto, Stand-by