This Concept Map, created with IHMC CmapTools, has information related to: Node_14a_Precheck to Parallel the Turbo Alternator, Electrical Power Emergency Generator Auto, Stand-by, Before Paralleling the Turbo Alternator Ensure Boilers, Boilers Boiler 1 Pressure, Turbo Alternator is running without excessive vibrations, Electrical Power Turbo Generator 1 On, Electrical Power Shore Power Off, Before Paralleling the Turbo Alternator Ensure Deaerator, Before Paralleling the Turbo Alternator Ensure Turbo Alternator, Deaerator Full with guage glass reading Between 60~70 mm, Electrical Power Diesel Generator On, Condenser Condenser Vacuum Satisfactory and Cooling ON, Before Paralleling the Turbo Alternator Ensure Power, Boilers Boiler 2 Pressure, Tanks Atmospheric Drain Tank (ADT) About 60% full, Turbo Alternator is running without excessive noise, Before Paralleling the Turbo Alternator Ensure Tanks, Turbo Alternator is running without any other abnormality, Tanks Distilled Water Tank (DWT) About 60% full, Before Paralleling the Turbo Alternator Ensure Condenser, Pressure About 6 Mpa Running on HFO supply